top of page
img_024.jpg

Pre-fabrication Service and DfMA

 

Link The Best have more than 10 years of experience on Pre-fabrication of Pre-Insulated Pipe system and Design for Manufacture and Assembly (DfMA). Our Pre-fabrication team will share their knowledge with the aim to reduce product assembly cost and minimize the number of assembly operation at construction site.

bottom of page